keiran daly

This project was too crazy to work. It was overly ambitious and there were a lot of problems with production and me and everything, and in the end the project failed, however:

- This is the present.

- I've learnt a lot of valuable lessons from this project.

- The only thing I have control over is what I do with these two to influence my future.

https://www.youtube.com/channel/UCfYtjahUG8nhFYAM31v_kJA